Quick take: The Generac Guardian 26kW costs $250 less; the Generac Guardian 26kW is quieter at 67 dB.

SpecGenerac Guardian 26kWKohler 26kW RCA
Price$6,849$7,099
Rating4.6★ (450)4.6★ (150)
TypeHome Standby GeneratorHome Standby Generator
FuelNG/LPNG/LP
Running / Output Watts26,000W26,000W
Starting / Surge Watts26,000W26,000W
Battery Capacity
Expandable To
Noise67 dB70 dB
RuntimeContinuous (runs on home NG/LP supply); 26kW on LP, 22.5kW on NGContinuous (runs on home NG/LP supply); 26kW on LP, 24kW on NG
OutletsNone — hardwired via automatic transfer switch (7291 bundle adds 200A ATS)None — hardwired via automatic transfer switch (sold separately)
Fuel Tank
Weight518 lbs625 lbs
Transfer-switch readyYesYes
Warranty5-year limited5-year/2,000-hour limited

Pros & cons

Generac Guardian 26kW

  • 26kW air-cooled tops the class for raw output
  • Starts dual AC compressors with load management
  • Costs far less than any liquid-cooled alternative
  • Compact enclosure for the output — same pad as smaller units
  • <5% THD with ±1% voltage regulation
  • 5-year warranty and ubiquitous parts supply
  • 22.5kW on natural gas — a 3.5kW derate
  • Same Evolution controller failure reports as cheaper Guardians
  • 67 dB under load; not a small-lot-friendly machine
  • Transfer switch extra on this SKU
  • Air-cooled engine at max rating runs hot; owners in the South watch oil intervals closely

Kohler 26kW RCA

  • Best-in-class 24kW natural gas rating
  • Starts dual large AC compressors with PowerBoost
  • Build quality and enclosure hardware a step above the price peers
  • 5-year/2,000-hour warranty; strong extended options
  • Oil and pressure sensors protect the engine automatically
  • Fewer reported controller issues than the Generac equivalent
  • 70 dB at rated load — plan placement carefully
  • 625 lbs demands a bigger pad and crane-assisted placement
  • Dealer and installer coverage is spotty outside metro areas
  • Transfer switch extra on the base SKU
  • Post-storm lead times can run months